Americas

#ProductionPlanning

Manufacturas Eliot adopts FastReactPlan to manage increase in order volumes and complexity and reduce lead times

FastReactPlan has been selected to digitize production planning processes so that Manufacturas Eliot can manage its increasingly complex supply chain…

South East Asia

American Phil Textiles

#MethodTimeCostOptimisation

American Phil Textiles achieves a 5% increase in work efficiencies

The T-Shirt and lingerie manufacturing specialist also benefitted from an increase in orders, on-time deliveries, overall profitability and staff motivation;…

South East Asia

#ProductionPlanning

Zhangjiagang Top Textile digitally transforms processes using FastReactPlan

FastReactPlan was chosen to realise a seamless exchange of information between a number of systems; significantly increase efficiencies; reduce overtime…

Americas

Vertical Knits FastReactPlan

#ProductionPlanning

Vertical Knits adopts Coats Digital’s FastReactPlan to meet increased volume and order complexities

FastReactPlan was chosen to digitize manual planning processes and provide a unified version of the truth across all Vertical Knits’…

Americas

RA Intertrading - GSDCost

#MethodTimeCostOptimisation

RA Intertrading adopts GSDCost for accurate method standard

Coats Digital’s GSDCost enables RA Intertrading to create accurate method standards to optimise workforce processes to meet growing demand

South East Asia

#FabricOptimisation

Viet Vuong cuts fabric wastage by 2% and saves 3% in fabric cost with FastReactFabric

FastReactFabric additionally delivered BOM savings of 1.13%; overall wastage savings of 1.23%; optimised productivity and increased customer satisfaction.

South East Asia

#MethodTimeCostOptimisation

SAE-A adopts Coats Digital’s GSDCost to drive improved cost and production efficiencies around the globe

SAE-A Trading Co. Ltd., has implemented Coats Digital’s GSDCost solution in all 41 of its production facilities, across ten countries.

South Asia

#ProductionPlanning

Tusuka delights customers with significant OTDP improvements

Further benefits realised include an efficiency increase of 5%, as manual processes are replaced leading to higher employee job satisfaction,…

South Asia

Garment production floor in Azim Group factory in Bangladesh

#ProductionPlanning

Azim Group increases planning efficiency by 15%

Benefits realised include higher efficiency in order confirmation time, performance to plan, cut to ship, plan & actual factory efficiencies…

Europe, Middle East, and Africa

DTRT Apparel Production floor in a garment production factory, Ghana

#ProductionPlanning

Mission-led manufacturer DTRT Apparel uses FastReactPlan to set new sustainability standards

As a cornerstone of an ambitious, multi-year growth strategy, DTRT (Do The Right Thing) is leveraging FastReactPlan across all production…

South East Asia

Duc Hanh production floor

#FabricOptimisation

Duc Hanh, reduces fabric wastage by almost 2% with FastReactFabric

Waste reduction, real-time planning, fabric optimisation, smarter buying, and BOM savings are the key benefits FastReactFabric has delivered for Duc…

South Asia

Woman working at Sewing in Dekko Group

#FabricOptimisation

Dekko Designs Ltd. gains 1% top-line growth with FastReactFabric

Bangladesh’s leading garment manufacturer Dekko Designs Ltd. chose Coats Digital’s FastReactFabric to implement best practice fabric planning and cutting execution…